摘要 针对三峡水利枢纽右岸电站厂房尾水护坡坡度陡、落差大、范围广等特点,为加快施工进度,三峡水利枢纽右岸尾水渠护坡混凝土采用了强制式滑模进行施工,从而解决了陡边坡混凝土不便使用配重式滑模的问题,不仅保证了混凝土的浇筑质量,而且加快了混凝土的施工进度。重点介绍护坡滑模的设计及其配置、施工方法等。 In view of steep slope,great drop and extensive area of the tailrace slope protection for the right bank powerhouse of the Three Gorges water control project,compulsory slipforms are used for construction of the tailrace concrete slope protection,which solves the inconvenience in use of counter-weight slipform for steep slope concrete,ensures the concrete placement quality and accelerates the construction schedule.The paper focuses on the design,configuration and construction method of slipform for slope protection.
作者 刘峰 徐婷婷
出处 《西北水电》 2011年第4期52-54,58,共4页 Northwest Hydropower
关键词 右岸 护坡 滑模 施工 三峡水利枢纽 right bank slope protection slipform construction Three Gorges water control project
  • 相关文献

参考文献4

二级参考文献11

共引文献19

同被引文献9

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部