摘要
以功果桥水电站库区移民集中安置点规划设计为例,探讨既解决移民实际需要,又创造宜居环境的社会主义新农村的规划设计思路。
Taking the planning and design of concentrated resettlement points for Gongguoqiao hydropower station for example,the paper discusses the planning and design concept for solving the actual needs of resettlers and creating socialist new villages with livable environment.
出处
《西北水电》
2011年第4期64-67,87,共5页
Northwest Hydropower
关键词
功果桥水电站
库区
移民安置
规划设计
Gongguoqiao hydropower station
reservoir area
resettlement
planning and design