摘要
介绍了新疆华电红雁池发电有限责任公司#1机组原分散控制系统存在的各种软、硬件问题,分析了采用OC6000e系统进行升级时遇到的问题,通过优化升级使#1机组新改造的分散控制系统发挥了最佳控制效果。
The defects in software and hardware of original distributed control system used in unit No.1 of Xinjiang Huadian Hongyanchi Power Generation Corporation Limited.were introduced.The problems,which are encountered in upgrading the DCS using OC6000e,were analyzed.Based on the optimized upgrading,the best control effect was obtained by the reformed distributed control system of the unit No.1.
出处
《华电技术》
CAS
2011年第8期55-57,80,共3页
HUADIAN TECHNOLOGY
关键词
分散控制系统
升级
应用
优化
distributed control system(DCS)
upgrade
application
optimization