摘要
介绍了液压顶升装置在烟气湿法脱硫改造工程中的应用情况以及液压顶选用和吸收塔改造倒装的方法,通过相关计算,证明了吸收塔顶升的安全性。
The application of the hydraulic jacking device in wet FGD reformation project was introduced.The selection of the hydraulic jacking device and the reverse erection method used in absorption tower reformation were described.Based on related calculation,the safety of the absorption tower jacking was proved.
出处
《华电技术》
CAS
2011年第8期73-76,80,共4页
HUADIAN TECHNOLOGY