期刊文献+

武器装备体系建设风险的风险因子模糊综合评价 被引量:3

Risk Factor Fuzzy Integration Evaluation of Weaponry and Equipment System of Systems Construction Risk
下载PDF
导出
摘要 为实时、准确地评价和跟踪武器装备体系(system of system,SoS)建设过程中的风险,对武器装备体系建设风险的风险因子进行模糊综合评价。分析武器装备体系建设风险的来源和成因,并将武器装备体系建设风险评价划分为5级层次,引入风险因子的概念,建立武器装备体系建设的风险评价模型,对武器装备体系建设风险进行5级模糊综合评价。该模型客观合理,为武器装备体系建设风险的评价提供了一种简单实用的方法。 In order to evaluate and track the construction risk of weaponry and equipment system of systems (WESoS) timely and exactly, a fuzzy integration evaluation of the construction risk factor of WESoS is given. Analysis of the sources and elements of construction risk of WESoS, the construction risk of WESoS was divided into five grades. The concept of risk factor was introduced and a risk evaluation model was given, after that, the five grades fuzzy integration evaluation of WESoS construction risk based on the model was discussed. The model is of impersonality and in reason, which provided a simple and practical method for construction risk evaluation of weaponry and equipment system of systems.
出处 《兵工自动化》 2011年第8期1-3,26,共4页 Ordnance Industry Automation
基金 "十一五"国防预研项目(513300102) 国家自然科学基金项目(70901074)
关键词 武器装备体系 风险因子 模糊综合评价 weaponry and equipment system of systems risk factor fuzzy integration evaluation
  • 相关文献

参考文献9

二级参考文献25

共引文献92

同被引文献23

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部