摘要
泄槽底部基岩开挖高程的确定,应根据水工模型定床和动床试验成果,结合水利工程的实际地形和地质情况,经过分析论证进行。对于地质不良地段不必全部挖除,应采用合理的处理方式,科学地选定建基面。
Discharge groove bottom bedrock excavation elevation determination,should be based on hydraulic model fixed bed and mobile bed test results,water conservancy projects and the geologic condition of terrain,analysis.For bad geological location excavation,we should adopt rational handling,scientifically select foundation surface to ensure that discharge water buildings meet the design requirements,and reduce the cost of projects.
出处
《邢台职业技术学院学报》
2011年第3期72-73,共2页
Journal of Xingtai Polytechnic College
关键词
泄水建筑物
建基面高程
工程造价
selected discharge water buildings
foundation surface
reasonably reduce project cost