期刊文献+

斜井在长输管道黄土塬冲沟地段施工中的应用 被引量:1

Application of inclined shaft in the construction at long-distance pipeline soil gulch section
下载PDF
导出
摘要 以"榆林—济南输气管道工程线路八标段冲沟施工"为例,重点介绍了长输管道在黄土塬冲沟地段的穿越施工经验,通过斜井辅助施工,大大降低了难度和成本,从而确保工程质量、缩短工期、降低施工风险,是一种值得推广应用的施工技术。 Taking the gulch construction at No. 8 standard section on Yulin-Ji' nan natural gas pipeline engineering as the example, it mainly introduces the experience of crossing construction at long-distance pipeline soil gulch section. Through inclined shaft auxiliary construction, it greatly reduces difficult degree and cost. As a result, it guarantees the project quality, shortens construction duration, and reduces construction risks. Therefore,it is kind of construction technology which is worth promoting.
出处 《山西建筑》 2011年第26期105-106,共2页 Shanxi Architecture
关键词 长输管道 斜井 冲沟 施工工法 long-distance pipeline, inclined shaft, gulch, construction methods
  • 相关文献

参考文献3

  • 1SY/T4079-1995,石油天然气管道穿越工程施工及验收规范[S].
  • 2DL/T5407-2009,水电水利工程斜井竖井施工规范[S].
  • 3GB50424-2007,油气输送管道穿越工程施工规范[S].

共引文献23

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部