十二孔闸改建工程抢工措施探讨 被引量:1

Measures of Urgent Work in Twelve Holes Sluice Reconstruction Project
下载PDF
导出
摘要 十二孔闸改建工程因"引黄补淀"要求,工期由原来设计的10个月压缩为两个半月,改建工程项目部克服多项困难组织抢工,在抢工过程中出现一些不足之处给抢工任务造成不利影响,该文着重分析抢工措施中的不足之处及提出应该注意的问题。 The project of rebuilding the Twelve Water Gate,which duration of ten months from the original design into a two and a half months reason for Yellow River-Baiyangdian water diversion project.The Department of reconstruction projects overcomed many difficulties and organized rob workers.Some flaws during construction rush caused the adverse impact to the construction.This article focuses on the deficiencies of engineering measures to grab and issues should be noted.
出处 《水科学与工程技术》 2011年第4期58-61,共4页 Water Sciences and Engineering Technology
关键词 抢工措施 施工难点 措施缺陷 提出建议 grab public measures construction difficulties measures defects recommendations
  • 相关文献

参考文献4

  • 1白洋淀千里堤十二孔闸改建工程初步设计报告[R].2009.
  • 2李国辉,许崇山.如何在抢工期中确保施工质量[J].黑龙江科技信息,2009(18):218-218. 被引量:1
  • 3缪长江.建设工程项目管理(第二版)[M].北京:中国建筑工业出版社.2010.
  • 4GB50502-2009,施工组织设计规范[S].

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部