十二孔闸改建工程因"引黄补淀"要求,工期由原来设计的10个月压缩为两个半月,改建工程项目部克服多项困难组织抢工,在抢工过程中出现一些不足之处给抢工任务造成不利影响,该文着重分析抢工措施中的不足之处及提出应该注意的问题。
The project of rebuilding the Twelve Water Gate,which duration of ten months from the original design into a two and a half months reason for Yellow River-Baiyangdian water diversion project.The Department of reconstruction projects overcomed many difficulties and organized rob workers.Some flaws during construction rush caused the adverse impact to the construction.This article focuses on the deficiencies of engineering measures to grab and issues should be noted.
出处
《水科学与工程技术》
2011年第4期58-61,共4页
Water Sciences and Engineering Technology
关键词
抢工措施
施工难点
措施缺陷
提出建议
grab public measures
construction difficulties
measures defects
recommendations