曹妃甸通用码头二期工程沉降位移观测分析 被引量:1

Settlement and displacement observation of Caofeidian universal terminal phase Ⅱ engineering
下载PDF
导出
摘要 曹妃甸通用码头二期工程采用沉箱重力式结构,抛石基床施工时分别采用分层夯实和一次爆夯的方式,该结构和施工方法在曹妃甸港区码头中系首次。工程实施过程中对码头在施工期各阶段的沉降、位移进行了全面观测,对获取的数据进行了细致分析,对类似工程施工具有借鉴意义。 Caofeidian universal terminal phase II engineering adopts the caisson gravity structure,and the rubble bed construction employs hierarchical compaction and blasting ramming,which were applied for the first time in Caofeidian quays.Comprehensive observations of settlement and displacement at various stages are executed in the construction process.The analysis of the data adopted may serve as a reference for similar projects.
出处 《水运工程》 北大核心 2011年第8期65-69,共5页 Port & Waterway Engineering
关键词 沉降位移 曹妃甸 码头 settlement and displacement Caofeidian quay hierarchical compaction blasting ramming
  • 相关文献

参考文献3

  • 1JTS167-2-2009重力式码头设计与施工规范[S].
  • 2JTS 147-1-2010,港口工程地基规范[S].
  • 3JTJ203-2001.水运工程测量规范[S].[S].,..

共引文献176

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部