武汉某深基坑工程监测分析 被引量:8

Monitoring and Analysis on a Deep Foundation Pit Engineering in Wuhan
下载PDF
导出
摘要 简要介绍了武汉某深基坑的围护设计、施工和监测方案,并对主要监测结果进行了详细分析,并得出了一些有利于基坑安全的指导性的结论。监测结果表明:地下连续墙后的堆载将对墙体的变形产生很大的影响,施工中,要将开挖土方及时运出场外,确保基坑及相邻建筑物的安全。由于基坑施工周期较长,温度的变化对监测结果也有较大的影响。 The supporting design,construction and monitoring schemes of a deep foundation pit in Wuhan are introduced here in detail,and the main monitoring results are analyzed in order to get some instructive conclusions that could ensure the security of the pit.The monitoring results indicate that the preloading behind concrete diaphragm wall would have great impacts on the deformation of the concrete diaphragm wall.So during the construction of the pit,the excavated earth should be transported out in time in order to ensure the security of the pit and the adjacent buildings.Moreover,due to the long period of foundation pit's construction,the seasonal variations of temperature would have great impacts on the result of monitoring.
出处 《水利与建筑工程学报》 2011年第4期109-111,123,共4页 Journal of Water Resources and Architectural Engineering
关键词 深基坑 变形监测 地下连续墙变形 支撑轴力 deep foundation pit deformation monitoring deformation of concrete diaphragm wall supporting force
  • 相关文献

参考文献7

二级参考文献18

共引文献162

同被引文献67

引证文献8

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部