摘要 针对基于主变互联和N 1准则的配电系统供电能力计算方法未能计及联络容量与主变短时过载的问题,提出解决方案并构建完善的配电系统供电能力计算方法。一方面通过建立联络约束矩阵来适应变电站间联络线容量较大的差异性;另一方面,定义虚拟联络矩阵来描述因主变短时过载而产生的负荷二次转带过程,在此基础上,建立负荷综合转移矩阵。最后将上述2项改进引入到基于主变互联和N 1准则的配电系统供电能力计算方法之中,形成考虑实际配电系统运行状况的配电系统供电能力计算方法。通过某实际配电网的供电能力分析,验证所提出方法的有效性。 The traditional way of calculating power supply capability of distribution system, based on the interconnection is formed by main transformer and the N-1 guideline, is defective without considering tie-line capacity and the main transformer's short-term overload. In this paper, an improved method was proposed to solve this problem. Firstly, the tie-line constraint matrix was established to~ accommodate the large differences of tie-line capacities among transformer substations; then, a virtual contact matrix was defined to describe the load's second transfer process caused by the main transformer's short-term overload, and on which basis formed the load synthetic transfer matrix. These two modifications were introduced into the traditional method, to calculate the power supply capability of distribution system considering actual operating conditions. Finally the effectiveness of the method was verified through analyzing the power supply capability of a real distribution system.
出处 《中国电机工程学报》 EI CSCD 北大核心 2011年第25期97-103,共7页 Proceedings of the CSEE
关键词 配电系统 供电能力 短时过载 联络容量 distribution system power supply capability short-term overload tie-line capacity
  • 相关文献

参考文献20

二级参考文献138

共引文献452

同被引文献652

引证文献74

二级引证文献707

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部