业主在商业工程建设后期的项目管理重点

Focus on Project Management of the Owner during Commercial Construction Late Stage
下载PDF
导出
摘要 商业工程建设后期以竣工备案为总目标。应与合作伙伴达成共识,采用管理跨度适当的承发包体系,重视界面,采购,沟通,风险管理。
作者 范新宇
出处 《安徽建筑》 2011年第5期210-211,28,共3页 Anhui Architecture
  • 相关文献

参考文献2

二级参考文献7

  • 1Kelly R. Tilford. Impact of Environmental Contamination on Construction Projects. Journal of Management in Engineering.Jan2000, 126 (1): 45-51.
  • 2Therivel R. And Partidario M. R. Introduction. In The Practice of Strategic Environmental Assessment. London. 1996(15).
  • 3Anderson, Stuart D. Fisher, Deborah J. Rahman, Suhel P..Integrating Constructability into Project Development: A Process Approach. Journal of Construction Engineering and Management. 2000, 126 (2).
  • 4M. Robert. Project Performance Control in Reconstruction Projects. Journal of Construction Engineering and Management.2000, 126 (2): 137 ~" 141.
  • 5Gawthrop, Peter. Environment for specification, design, operation, maintetmnce, and revision of manufacturing control systems. IEE Conference Publication. Mar 1990:104-110.
  • 6D. K. H. Chua, P. K. Loh. Critical Success Factors for Different Project Objectives. Journal of Construction Engineering and Management. 1999, 5- 6.
  • 7李祚泳,彭荔红,程红霞.基于GA优化的城市可持续发展评价的普适公式[J].系统工程,2000,18(6):6-10. 被引量:11

共引文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部