摘要
日月山750 kV变电站是我国目前同电压等级海拔最高的变电站,是国家电网公司重点工程之一,工程质量目标是争创中国建筑工程"鲁班奖"。施工技术资料是反映和评价工程质量的重要组成部分,也是工程创优争奖目标能否实现的关键。文章阐述了日月山750 kV变电站施工技术资料控制管理的特点、控制方法,为今后变电工程电气安装技术资料的编制规范化提供了思路。
750kV Riyueshan substation is the highest altitude substation among the same voltage grade,as one of the important project of State Grid Corporation of China,the quality objective of the project is to create Luban prize.Construction technical documents is an important part of evaluating the project quality,and it's the key point of realizing quality prize.The paper discusses the character and control method of construction technical documents for 750kV substation,and it provides comprehensive thread for the substation electrical installation technical documents in future.
出处
《青海电力》
2011年第F07期67-69,共3页
Qinghai Electric Power
关键词
工程施工
技术资料
控制
管理
engineering construction
technical documents
control
management