摘要 针对现有的战备完好性计算模型与备件数量关联度不强的问题和基于战备完好性的备件数量计算大多采用仿真方法的不足,提出了能够考虑备件数量影响的舰船装备任务可用度的概念及其计算模型,并在此基础上研究了寿命服从指数分布的备件在故障后采用更换策略时,装备的任务可用度与备件携行量的关系,得到了一个可以通过解析计算确定备件数量的新模型。算例计算及与仿真结果的对比证明了该模型的正确性与有效性。 As the association between quantity of spare paLts and quantity of spare parts based on material readiness is often calculated through simulation. According to the conception of mission availability of ship equipment and its calculation mode used for spare parts calculation, the relationship between the quantity of spare parts and mission availability was studied as to the life of spares subject to exponential distribution and the replacing strategy. And a new analytic spare parts calculation model was proposed. By comparing the calculation results with the simulation results, the model was proved to be correct and efficient.
出处 《海军工程大学学报》 CAS 北大核心 2011年第4期70-73,共4页 Journal of Naval University of Engineering
关键词 可用度 备件 Monte—Carlo availabilityl spare parts Monte-Carlo
  • 相关文献

参考文献6

二级参考文献33

  • 1.海军作战部长办公室指令9010.300:供海军舰船研制用的最高要求书与最高规格书[Z].,1978..
  • 2龚九功.现代舰船可靠性发展研究.舰船情报研究报告,CQ—B 93012[R].,1993..
  • 3.美海军装备部文件.NAVMATINST 3000.2作战使用可用性[Z].,1981..
  • 4.美海军部OPNAVINST 3000.12设备和武器系统的使用可用性[Z].,1987..
  • 5.DDG 51级舰作战使用可靠性研究——以战备完好性为基础的备件配置法(RBS)实施过程[Z].N E J,1991..
  • 6陆福祥.在舰船研制过程中可用度要求的探讨[A]..舰船标准资料汇编[C].,1990..
  • 7.GJB 1909.6—94.装备可靠性维修性参数选择和指标确定要求-舰船[S].,..
  • 8.GJB 3837—99.装备保障性分析记录[S].,..
  • 9.GJB 451.可靠性维修性术语[S].,..
  • 10Michael F. Home. Royal Australian Navy logistic challenges to satisfy national self-reliance objectives whilst preserving allied logistic interoperability, May 1994.

共引文献38

同被引文献125

引证文献10

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部