柏叶口水库堆石坝面板混凝土的施工 被引量:1

Constructing Concrete Face Slab of Baiyekou Reservoir's Rockfill Dam
下载PDF
导出
摘要 柏叶口水库坝体型式为混凝土面板堆石坝,最大坝高88.3 m,坝顶长310 m。采用滑模技术进行面板混凝土施工,面板共分25块,每块宽12 m,最大坡长143.68 m,面板混凝土总方量13 803 m3。面板厚度从上至下逐渐变厚,顶厚30 cm,底部最大厚度59 cm。采用2套滑模施工,叙述了具体的施工技术和方法。 The Baiyekou Reservoir's dam is a concrete facing rockfill dam.The maximum height of dam is 88.3m,the length of dam top is 310m.The slip-form technique is used to construct dam's concrete face slab.The whole concrete face slab is divided into 25 blocks.Every block's width is 12m.The maximum length of dam slope is 143.68m.The total quantity of concrete is 13803m3.The thickness of face slab gradually increases from top to bottom.The top's thickness is 30cm and the maximum bottom's thickness is 59cm.The concrete face slab is constructed by two sets of slip-form.In the paper,the concrete construction techniques and methods are narrated.
作者 谢念
出处 《山西水利科技》 2011年第3期12-13,20,共3页 Shanxi Hydrotechnics
关键词 面板混凝土 施工 滑模 concrete face slab construction slip-form
  • 相关文献

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部