柏叶口水库坝体型式为混凝土面板堆石坝,最大坝高88.3 m,坝顶长310 m。采用滑模技术进行面板混凝土施工,面板共分25块,每块宽12 m,最大坡长143.68 m,面板混凝土总方量13 803 m3。面板厚度从上至下逐渐变厚,顶厚30 cm,底部最大厚度59 cm。采用2套滑模施工,叙述了具体的施工技术和方法。
The Baiyekou Reservoir's dam is a concrete facing rockfill dam.The maximum height of dam is 88.3m,the length of dam top is 310m.The slip-form technique is used to construct dam's concrete face slab.The whole concrete face slab is divided into 25 blocks.Every block's width is 12m.The maximum length of dam slope is 143.68m.The total quantity of concrete is 13803m3.The thickness of face slab gradually increases from top to bottom.The top's thickness is 30cm and the maximum bottom's thickness is 59cm.The concrete face slab is constructed by two sets of slip-form.In the paper,the concrete construction techniques and methods are narrated.