摘要
论述了唐河水电站施工中的几个问题,介绍了工程施工导流的实施方案,采用混凝土挡墙处理右坝肩,提高了面板坝趾板基础,还讨论了混凝土冬季施工的保温问题。
The paper expounds several problems in construction process of Tanghe Hydroelectric Station project,including determining construction diversion planning,using concrete retaining wall to treat dam abutment,raising dam toe slab on base,and discusses the heat preservation problem of concrete in winter construction.
出处
《山西水利科技》
2011年第3期44-45,共2页
Shanxi Hydrotechnics
关键词
唐河水电站
施工导流
坝肩处理
基础趾板
冬季施工
Tanghe Hydroelectric Station
construction diversion
treatment of dam abutment
toe slab on base
winter construction