期刊文献+

定向钻在天然气管道穿越永定河工程的应用 被引量:16

Application of Directional Drilling Technology to Natural Gas Pipeline Project Crossing Yongding River
下载PDF
导出
摘要 比较了围堰法、顶管法和定向钻法穿越河流的施工工艺及优缺点,探讨了天然气管道穿越永定河方案的比较及选择、对GB 50286—98《堤防工程设计规范》相关条文的理解,提出了为进一步提高安全性采取的技术措施。 The construction technology as well as advantages and disadvantages of cofferdam method, pipe jacking method and directional drilling method for crossing rivers are compared. The comparison and selection of natural gas pipeline crossing Yongding River schemes as well as the understanding on the relevant articles in Code for Design of Levee Project ( GB/ T 50286 - 98 ) are discussed. The technical measures for further improving safety are put forward.
出处 《煤气与热力》 2011年第8期5-8,共4页 Gas & Heat
关键词 定向钻 非开挖 天然气管道 穿越河流 围堰法 顶管法 directional drilling trenchless natural gas pipeline crossing river cofferdam method pipe jacking method
  • 相关文献

参考文献7

二级参考文献18

共引文献38

同被引文献73

引证文献16

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部