摘要
针对当前张家口市新建住宅小区的用电负荷,提出了两种快速、可靠的测算方法,并根据最大负荷,讨论了配变容量的确定,最后给出了实例分析。
According to power load of new residential block of Zhangjiakou City, two kinds of measurements and calculation method were proposed, and decision on capacity of distribution transformer was discussed based on maximum power load. After all, case study was given through these two measurements and calculation methods.
出处
《华北电力技术》
CAS
2011年第8期16-18,26,共4页
North China Electric Power
关键词
新建住宅小区
最大负荷
配变容量
测算
new residential block
maximum load
capacity of distribution transformer
measurements and calculation