加强高速铁路“四电”工程合同管理的措施 被引量:2

Measure for Strengthening High-Speed Railway "Four Electric" Project Contract Management
下载PDF
导出
摘要 随着高速铁路的不断发展,"四电"工程合同管理有待进一步加强。针对"四电"工程合同管理中存在的主要问题进行分析,提出进一步加强合同管理(建立合作共赢的合同主体关系、处理好工程分工界面和接口配合、确保公正合理的合同条款和建立动态的合同管理系统)的4项措施。为保证工程建设目标的实现提供保障。 With the constant development of high-speed railway,"four electric"project contract management should be strengthened.The main problems in"four electric"project contract management is analyzed and 5 measures(establish contract subject relationship of win-win cooperation,settle engineering division interface and interface match well,ensure fair and reasonable on the terms of the contract and set up dynamic contract management system)of strengthening"four electric"work contract management are presented to provide ensure for realizing construction project target.
作者 胡晓红
出处 《铁路工程造价管理》 2011年第4期18-20,34,共4页 Railway Engineering Cost Management
关键词 高速铁路 “四电”工程 合同管理 措施 high speed railway "four electric" project contract management measure
  • 相关文献

同被引文献6

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部