摘要 上海容灾中心工程是国内首次由业主主导,将建筑信息模型(BIM)技术应用于大型数据中心全生命周期工程建设的实施案例。讨论了上海容灾中心建设中存在的难点问题,分析了BIM技术三维可视化真实建模、自动碰撞检查、快速准确的工程量统计、动态施工模拟等优点。上海容灾中心在施工阶段和运行维护阶段应用BIM技术,保证了施工高质量的管理效益,提高了工程设计、施工和运行维护的效率。 Shanghai Disaster Tolerance Center (SDTC) is the first case led by owner to apply the building infor- mation model (BIM) technology in the life cycle engineering construction of the center. The difficult problems in the SDTC construction are discussed. The advantages of BIM technology including 3-dimension visualized virtual modeling, auto-bumping check, quick and precise workload statistics, dynamic construction simulation etc are analyzed. BIM technology is applied in construction, operation and maintenance of SDTC to guarantee the quality management performance of construction, improve the efficiency of design, construction, operation and maintenance of the SDTC.
作者 张斌
出处 《供用电》 2011年第4期5-7,13,共4页 Distribution & Utilization
关键词 上海容灾中心 三维可视化真实建模 自动碰撞检查 建筑信息模型技术 Shanghai Disaster Tolerance Center 3-dimension visualized virtual modeling auto-bumping check building information model technology
  • 相关文献

参考文献1

二级参考文献1

  • 1中华人民共和国工业和信息化部.GB50174--2008电子信息系统机房设计规范[S].北京:人民出版社,2009.

共引文献2

同被引文献44

  • 1熊文.广州电网调度自动化系统容灾备份研究[J].继电器,2004,32(20):60-61. 被引量:14
  • 2曹汉成.提高我厂电力功率因数的对策[J].陕西能源,1989(1):24-25. 被引量:1
  • 3Morgenstern O. Civil Defense: Economic Problems[J]. Scientist and Citizen, 1966, 8(4-5): 1-5.
  • 4Meier lk L. The Social Impact of a Nuplex[J]. Bulletin of the Atomic Scientists, 1969, 25(3): 16-21.
  • 5Kenney V P, Lucey J W. Energy Demand-Energy Supplies[M]. Nuclear Energy. Springer US, 1985: 49-72.
  • 6Bhattacharya J L, Woodward J L. Excitation balancing of a self- excited induction generator for maximum power output[C], lEE Proceedings Generation, transmission and distribution, lET, 1988, 135(2): 88-97.
  • 7Jones R A, Sims T R, Imece A F. Investigation of potential islanding of a self-commutated static power converter in photovoltaic systems[J]. Energy Conversion, IEEE Transactions on, 1990, 5(4): 624-631.
  • 8Gaushell D J. Automating the power grid: Real-time communication between customers, the electricity grid, and power plants can cut costs for both supplier and user; the technology options are inany[J]. Spectrum, IEEE, 1985, 22(10): 39-45.
  • 9Liu Y. Short-term operational reliability evaluation for power systems under extreme weather conditions[C]. Power Tech, IEEE Eindhoven. IEEE. 2015: 1-5.
  • 10Ma G, Jiang L, Xu G, et al. A Model of Intelligent Fault Diagnosis of Power Equipment Based on CBR[J]. Mathematical Problems in Engineering, 2015.

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部