PKPM运用于那吉电站副厂房结构设计所遇问题及对策 被引量:1

Problems of Using PKPM in the Auxiliary Station Organizational Design of Naji Power Station and the Solutions
下载PDF
导出
摘要 水工建筑物形式多变,结构复杂,目前国内外还没有研制出能综合、整体解决水工结构设计问题的成熟软件,因而只能借助工民建结构设计软件进行辅助设计。文章介绍了PKPM软件在那吉航运枢纽工程电站副厂房结构设计中的运用情况,着重介绍了应用PKPM软件遇到的问题及对策。 The forms of hydraulic structures are various and complicate.Because at present,there is no any mature software that can comprehensively deal with some problems about the design of hydraulic structures at home and abroad,people just have to fulfill the task by means of structure design software of civil engineering fitting.The paper mainly introduces the situation about the application of PKPM to the auxiliary station organizational design of Naji key shipping power station and some existing problems and solutions to the application.
作者 黄志慧
出处 《企业科技与发展》 2011年第9期75-76,97,共3页 Sci-Tech & Development of Enterprise
关键词 PKPM软件 电站副厂房 结构计算 PKPM software auxiliary power station organizational calculation
  • 相关文献

参考文献1

  • 1中国建筑科学研究院PKPMCAD工程部.PKPM用户手册[z].2001.

共引文献1

同被引文献11

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部