摘要 介绍了天兴洲公铁两用长江大桥铁路箱梁移动模架整体提升施工方法,主要包括地基承载力、钢管立柱、吊装钢箱梁的设计计算,结构稳定性计算,以及提升站安装时应该控制要点.实践表明,移动模架整体提升加快施工速度,移动模架的结构质量也易于保证;移动模架整体吊装有其自身特点和优势,在施工中安全可控,操作简单. Introduced construction technology of box-beam MSS assemble and lifting in Tianxingzhou Changjiang Bridge,including the calculation of bearing capacity of foundation soil,strength calculation of the steel columns and box-beam lifting,the calculation of structural stability,and the key points of lifting station installation.The integral lifting and installation can speed up process of construction and guarantee the quality of construction.Practice indicates,movable shuttering form lifting had its own features and advantages,which was confirmed safe and controllable,and simple to operate.
作者 金永忠
出处 《武汉工程大学学报》 CAS 2011年第8期64-67,102,共5页 Journal of Wuhan Institute of Technology
关键词 移动模架 箱梁 提升站 设计 施工控制 整体吊装 movable shuttered form box girder lifting station design construction control integral lifting and installation
  • 相关文献

参考文献2

  • 1张启文,夏志斌.钢结构设计规范GB500017-2003[M].北京:中国计划出版社,2003.
  • 2黄熙龄,腾延京,土铁宏,等.建筑地基基础设计规范GB500017-2002[M].北京:中国建筑工业出版社,2002.

同被引文献15

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部