摘要
结合成都地铁1号线一期工程规划和设计,为实现高性价比的地铁工程,采取城市与地铁一体化规划、车站建筑优化布置和低能耗工法等措施;介绍机电设备系统新技术和节能、降造技术在工程中的应用情况,以及取得的社会经济效益。
In view of the phase 1 planning and design of Chengdu metro Line 1,measures were adopted including integrated city/metro planning,optimized station building layout and low energy consumption to realize a highly cost-effective metro project.New technical measures for saving energy and reducing costs for electro-mechanical equipment system in the project,together with the social and economic efficiency acquired,are also elaborated.
出处
《都市快轨交通》
2011年第4期41-44,共4页
Urban Rapid Rail Transit
关键词
城市轨道交通
成都地铁1号线
造价
节能
规划
设计
unban rail transit
Chengdu metro Line 1
cost
energy-saving
planning
design