摘要 为在深海复杂工况下把平台立管安装到位,需对安装过程进行监测。综合考虑船舶位移、升沉补偿、立管吊装变形,以声纳和远程操作潜水器(ROV)监测系统为技术支撑,监测管线着陆区位置、悬链线形态、以及海底地形等参数,指导立管的安装过程。形成一套完善的钢悬链线立管安装监测技术,促进我国深海石油的发展。 On the basis of complex natural environment,this paper researchs vessel motion,heave compensation of ship location and riser shape while laying and lifting.With the main ponit-ROV sonar monitoring system,study around touch down point of pipeline,steel catenary riser shapes and seabed topography were made.And then these paraments to guide analysis of riser installation process was used.Finally complete monitoring technologies for steel catenary riser installation was formed,to provide technical support for the development of offshore oil and innovation of monitoring technology for riser installation in China.
出处 《石油矿场机械》 2011年第8期19-23,共5页 Oil Field Equipment
基金 国家高技术研究发展计划(863计划)"深水海底管道铺设技术"(2006AA09A105)
关键词 海洋平台 立管 安装 监测 offshore platform riser installation monitor
  • 相关文献

参考文献5

  • 1王懿,段梦兰,李丽娜,何宁,王辉.深水立管安装技术进展[J].石油矿场机械,2009,38(6):4-8. 被引量:38
  • 2Roderick Y E, Scientific M S, Craig R C, et al. Load Monitoring at the Touchdown Point of the First Steel Catenary Riser Installed in a Deepwater Moored Semisubmersible Platform[ G]. Offshore Technology Conference, Houston, USA : OTC, 1999.
  • 3Metin Karayaka, Ph D. Steel Catenary Riser Response Characterization With on-Line Monitoring Devices[G]. In- ternational Conference on Offshore Mechanics and Arctic Engineering. Honolulu, Hawaii, USA: OMAE, 2009.
  • 4Dominique Perinet, Acergy France, Ian Frazer, et al. Strain Criteria for Deep Water Pipe Laying Operation [G]. Offshore Technology Conference. Houston,USA: OTC, 2008.
  • 5David A M. Subsea pipeline touchdown monitoring [G]. United States, Patent Application Publication, US 2004/0013471 A1. Jan. 22,2004.

二级参考文献13

共引文献37

同被引文献47

引证文献5

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部