PPP项目范式选择与风险分配的关系研究 被引量:38

Study of the relationship between PPP project mode and risk allocation
下载PDF
导出
摘要 基于15个案例,分析PPP项目三种范式选择方案与风险分配之间的相关关系,结果发现:一部分项目风险的分配方案与范式选择无关,这类风险的主要特征是产生主体明确且能够防范,风险事件的发生直接针对PPP项目;另一部分项目风险分配方案与范式选择高度相关,其相关关系体现为随着范式私有化程度的提高,民间实体承担的风险也在逐渐增大,而且随着范式选择的不同,风险转移的时机和程度也有所差异,这类风险的主要特征是风险事件产生于政府或第三方,民间实体没有能力进行防范,风险损失需要在政府和民间实体之间进行分配。研究结论可为提高我国PPP项目风险分配的科学性提供指导和借鉴。 based on 15 cases, this paper analyzes the relationships between the choice of three modes of PPP projects and risk allocation. It is found that part of project' s risk allocation plan is irrelevant to the choice of modes, the feature of which is that its subject is clear and the risks can be prevented, and the occurrence of risk events directly corresponds to the PPP projects. The other part of project' s risk allocation plan is highly correlated to the choice of modes. Along with the degree of privatization of the mode, the risk that a private entity is taking is gradually becoming higher, and when selecting different modes, the moment and level of risk shift are different; this type of risk events originates from the government or the third party, which a private entity is not able to prevent, and risk losses need to be distributed between the government and the private entity.
出处 《土木工程学报》 EI CSCD 北大核心 2011年第9期139-146,共8页 China Civil Engineering Journal
基金 国家自然科学基金(70803038) 陕西省重点学科建设专项资金 陕西省软科学研究计划(2009KRM074) 陕西省教育厅专项研究计划(07JK073)
关键词 PPP 范式选择 风险分配 Public-Private Partnerships choice of modes risk allocation
  • 相关文献

参考文献8

  • 1Wang S Q, Tiong R L K, Ting S K, et al. Evaluation and management of foreign exchange and revenue risks in China' s BOT projects [ J]. Construction Management and Economics, 2000,18 (2) : 197-207.
  • 2Wang S Q, Tiong R L K, Ting S K, et al. Foreign exchange and revenue risks : analysis of key contract clauses in China' s BOT project [ J ]. Construction Management and Economics, 2000,18(3) :311-320.
  • 3Wang S Q, Tiong R L K, Ting S K, et al. Evaluation and management of political risks in China' s BOT projects[ J]. Journal of Construction Engineering and Management, ASCE, 2000,126(3) :242-250.
  • 4刘新平,王守清.试论PPP项目的风险分配原则和框架[J].建筑经济,2006,27(2):59-63. 被引量:264
  • 5The Canadian council for public-private partnerships. Models of public-private partnerships [ EB/OL ]. Canada: The Canadian council for publlc-private partnerships, 2011. http ://www. pppcotmcil.ca/resources/about-ppp/models. html.
  • 6罗春晖.基础设施民间投资项目中的风险分担研究[J].现代管理科学,2001(2):28-29. 被引量:35
  • 7朱冰,李启明.工程项目风险分担问题的探讨[J].江苏建筑,2005(3):50-52. 被引量:8
  • 8邓小鹏,李启明,汪文雄,李枚.PPP模式风险分担原则综述及运用[J].建筑经济,2008,29(9):32-35. 被引量:56

二级参考文献35

共引文献319

同被引文献317

引证文献38

二级引证文献576

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部