摘要
利用成组技术的优化排序方法研究作业车间(Job Shop)的生产调度问题。针对M公司JobShop目前采用的调度方案总流程时间长、机器利用率低的现状,提出了改进的优化算法调度方案,降低了该公司零部件的加工周期,大大改善了机器利用率。
In this paper,we studied production management of Job Shop based on optimized sorting method of Group Technology(GT).According to the status of the total flow for a long time and the low utilization rate of machine from current production management of M company's Job Shop,we set up an improved production management of optimization algorithm,reduced the parts processing cycles of the company,greatly improved the utilization rate of machine.
出处
《苏州大学学报(工科版)》
CAS
2011年第4期42-47,共6页
Journal of Soochow University Engineering Science Edition (Bimonthly)