摘要
从安装、化学清洗、吹管、整套试运、凝结水精处理运行、停炉保养等方面介绍兴义电厂1号机组在试运期间对水汽品质的控制。
This article introduces the controlling of steam - water quality, during the trial running period of Unit 1 of Xingyi Power Plant, from aspects of installation, chemical cleaning, steam blowing, unit trial running, fine treatment system running for condensate water, shutdown and maintenance of unit, etc.
出处
《贵州电力技术》
2011年第8期17-19,共3页
Guizhou Electric Power Technology
关键词
超临界机组
试运
水汽品质
supercritieal unit
trial running
steam - water quality