期刊文献+

超高层建筑核心筒液压爬模施工技术 被引量:16

CONSTRUCTION TECHNIQUE OF HYDRAULIC CLIMBING FORMWORK OF SUPER HIGH-RISE BUILDING CORE TUBE
下载PDF
导出
摘要 在超高层建筑核心筒施工中,液压爬模工艺日趋完善,该工艺具有施工速度快、工程质量好、成本低等特点。河北开元环球中心工程施工中,结合工程实际情况,合理安排施工工序,立体交叉作业,采用多种安全措施,处理细部节点,有效地利用了空间、时间、设备和人力资源,提高了劳动效率,加快了施工进度。 The process of hydraulic climbing formwork in the construction of core tube of super high-rise building is becoming perfect, it has such characteristics as fast construction, favorable engineering quality and low cost, etc. In the construction of Hebei Kaiyuan International Centre engineering, construction sequences are arranged reasonably to realize tri-dimensional cross construction, and multiple safety measures are adopted to treat detail nodes. Space, time, equipments and labors are effectively used to improve the labor efficiency and quicken the construction schedule.
作者 王斌 冯涛
出处 《建筑技术》 北大核心 2011年第9期797-800,共4页 Architecture Technology
关键词 超高层建筑施工 核心筒 液压爬模工艺 super high-rise building construction core tube hydraulic climbing formwork process
  • 相关文献

同被引文献53

引证文献16

二级引证文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部