7Starfield A M,Bleloch A L.A new method for the computation of heat and moistue transfer in partly wet airway[J].Journal of South African Institute of Mining and Metallurgical,1983,83(11):263-269
8Uchino K,Inoue M.New practical method for calculation of air temperature and humidity along wet roadway--The influence of moisture on the underground environment in mines(2nd Report)[J].Journal of the Mining and Metallurgical Institute of Japan,1986,102(6):353-357
9Uchino K,Inoue M.Improved practical method for calculation of air temperature and humidity along a roadway under complicated conditions--The influence of moisture on the underground environment in mines(3rd Report)[J].Journal of the Mining and Materials Processing Institute of Japan,1990,106(1):7-12
10Sasaki K,Miyakoshi H,Mashiba K,et al.Analytical system for ventilation simulators with skyline nodal pressure method and practical estimate system for underground mine air-conditioning[A].26th Proceedings of the Application of Computers and Operations Research in the Mineral Industry[C].Pennsylvania:The Society of Mining,Metallurgy and Explosion Inc.,1996:393-399