摘要
介绍了华能陕西秦岭发电有限公司4×200 MW机组烟气脱硫改造工程及取消旁路烟气运行的实践,重点分析了脱硫系统无旁路运行时的存在问题,提出了应对措施。为电厂采用烟气脱硫无旁路运行技术,保证机组安全稳定运行提供了有益的经验。
Huaneng Shaanxi Qinling Power Co., Ltd. completed FGD renovation project for the 4×200 MW units, and got the practice of the operation with canceling the bypass. As an example, this paper focuses on the analysis of operation problem of desulfurization systems without bypass, and puts forward the corresponding measures for using the FGD without bypass, which provides a useful experience of safe and stable operation for the units.