期刊文献+

前轮毂压铸模具跑水的处理

Treatment of Metal Runout of Die-casting Mold for Front Hub
下载PDF
导出
摘要 以前轮毂压铸模具跑水导致的滑块卡死、斜导柱弯曲为例,通过对模具2次修改的过程表明,对于采用常规方式不能解决的模具问题,就要对模具的相关问题部位采用逐件分解、逐个确认的方法,去寻找问题产生的原因,针对原因采取适当的措施,才能从根本上解决模具的跑水。 The sticking of slide and the bending of oblique columns resulted by metal runout of die-casting mold for front hub were taken for cases. By modification of the mold with two times it indicated that for the mold problems which could not be solved by the traditional way, it was necessary to solve related problems by the methods of breaking up the mold piece by piece and confirming all, and looking for the causes of the problem. The problem of metal runout of die-casting mold could be solved fundamentally by taking appropriate measures.
作者 崔爱军
出处 《精密成形工程》 2011年第5期67-69,共3页 Journal of Netshape Forming Engineering
关键词 压铸模跑水 滑块卡死 模具处理 metal runout of die-casting mold sticking of slider mold treatment
  • 相关文献

参考文献1

  • 1潘宪曾.压铸模设计手册[M].北京:机械工业出版社,1998..

共引文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部