2Zhang B H, Yuan Y C, Chen Z, et al.Computation of optimal reclosure time for transmission lines IEEE Tran[J]. On Power Systems August 2002,17(3): 670-675.
3[11]ZHANG B H,YUAN Y C,CHEN Z,et al. Computation of optimal reclosure time for transmission lines [J].IEEE Trans. on Power Systems,2002,17(3):670-675.