摘要
在工程施工建设中,常因工期延误、合同施工期内国家政策调整、市场价格变化,导致承包人的人工、材料、机械费用增加,文章按相应计价规范规定,人工、材料、机械费用进行调整的计算,并以具体实例进行了说明。
During the construction period,due to the construction period delay policy adjustment and market price change often result in the cost increase of workman,materials and machinery for the conductors.In this study,the cost of workman,materials and machinery are recalculated according to the corresponding regulation,along with the detailed explanation of a concrete example.
出处
《黑龙江水利科技》
2011年第3期147-148,共2页
Heilongjiang Hydraulic Science and Technology
关键词
非承包人原因
工期延误
人工
材料
机械费用
调整计算
实例
reasons not resulting from conductor
construction period delay
workman
material
recalculation of machinery cost
example