摘要
针对以往混凝土坡屋面施工方法的弊端,提出采用安装双面模板的施工方法,详细介绍了安装双面模板施工坡屋面的具体工艺及操作要点,并分析了施工中可能出现的问题,提出了相应的防治措施,以期指导实践。
According to the shortage of previous construction methods in the concrete slope roof,the paper points out the construction methods of adopting the double-side model,introduces the factual craft and the operation points for the installation of the double-side model to construct the slope roof,analyzes the possible problems in the construction and points out the respective prevention measures,so as to direct the practice.
出处
《山西建筑》
2011年第28期107-108,共2页
Shanxi Architecture
关键词
坡屋面
双面模板
施工工艺
竖向龙骨
slope roof
double-side model
construction craft
vertical keel