2PODOLNY W J. The Cause of Cracking in Post Tensioned Concrete Box Girder Bridges and Retrofit Procedures[J].PCI Journal, 1985,30(2) :82-139.
3CHATELAIN J, GODART B, DUCHENE J L. Detection, Diagnosis, and Monitoring of Cracked Pres tressed Concrete Bridges [C]//NOWAD A S. Proceedings of the NATO Advanced Research Workshop on Bridge Evaluation,Repair and Rehabilitation. Dordrecht : Kluwer Academic Publishers, 1990 : 145-159.
4MOON D Y,SIM J, OH H. Practical Crack Control During the Construction of Precast Segmental Box Girder Bridges[J]. Computers & Structures, 2005,83 (31/32) :2584-2593.
6HOGNESTAD E, HONSON N W, MCHENRY D. Concrete Stress Distribution in Ultimate Strength De sign[J].ACI Journal Proceedings, 1955,52 (12) : 455- 480.
7AL-MANASEER A A, PHILLIPS D V. Numerical Study of Some Post-cracking Material Parameters Affecting Nonlinear Solutions in RC Deep Beams[J]. Canadian Journal of Civil Engineering, 1987,14 (5) : 655-666.
2PODOL N. The Cause of Cracking in Post Tensioned Concrete Box Girder Bridges and Retrofit Procedures [ J ]. PCI Journal, 1985,30(2) :82-139.
3CHATELA J, GODART B, DUCHENE J. Detection, Diagnosis NOWAD A S. Proceedings of the NATO Advanced Research Dordrecht : Kluwer Academic Publishers, 1990 : 145-159 and Monitoring of Cracked Prestressed Concrete Bridges [ C ] Workshop on Bridge Evaluation, Repair and Rehabilitation.