母线生产制造中的鲁棒性调度研究 被引量:1

下载PDF
导出
摘要 通过在母线生产调度过程中引入缓冲区域,实现了母线生产过程中的鲁棒性调度排产,降低了生产过程中不确定性扰动及变化带来的调度影响。本调度研究以镇江西门子母线公司为实际应用单位,分析了实际生产中的扰动变化,对实际生产问题进行了鲁棒求解,并对调度结果的鲁棒性进行了综合验证,证明了缓冲区域方法可以用于鲁棒调度。
出处 《黑龙江科技信息》 2011年第24期27-28,共2页 Heilongjiang Science and Technology Information
  • 相关文献

参考文献1

二级参考文献6

  • 1McKay K N, Buzacott J A, Safayeni F R. The Scheduler's Knowledge of Uncertainty [M]. Amsterdam, North-Holland: Elsevier, 1989. 171-189.
  • 2O'Donovan R, Uzsoy R, McKAY K N. Predictable scheduling of a single machine with breakdowns and sensitive jobs [J]. International Journal of Production Research,1999, 37: 4217-4233.
  • 3Wu S D, Storer R H, Chang P C. One machine rescheduling heuristics with efficiency and stability as criteria [J]. Comput Ops Res, 1993, 20: 1- 14.
  • 4Federgruen A, Mosheiov G. Single machine scheduling problems with general breakdowns, earliness and tardiness costs [J]. Operations Research, 1997, 45(1): 66- 71.
  • 5Koza J R. Genetic Programming [M]. Cambridge, MA:MIT Press, 1992.
  • 6Banzhaf W, Nordin P, Keller R E, et al. Genetic Programming [M]. San Francisco, CA: Morgan Kauffman,1998.

共引文献7

同被引文献13

  • 1郭伏,张国民.工作研究在流水线平整中的应用[J].工业工程与管理,2005,10(2):120-124. 被引量:73
  • 2张则强,程文明,钟斌,王金诺.求解装配线平衡问题的一种改进蚁群算法[J].计算机集成制造系统,2007,13(8):1632-1638. 被引量:37
  • 3Tang Qiuhua, Li Jie, Floudas C A. Optimization framework for process scheduling of operation-de- pendent automobile assembly lines[J]. Optimization Letters, 2012,6(4) :797-824.
  • 4Balin S. Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation[J]. Information Sciences, 2011, 181 (17): 3551-3569.
  • 5Ierapetritou M G, Pistikopoulos E N, Floudas C A Operational planning under uncertainty [J]. Com puters & Chemical Engineering, 1996, 20 (12): 1499-1516.
  • 6Lu Chung-Cheng, Lin Shih-Wei, Ying Kuo-Ching. Robust scheduling on a single machine to minimize total flow time[J]. Computers & Operations Research, 2012, 39(7): 1682-1691.
  • 7Bertsimas D, Pachamanova D, Sim M. Robust linear optimization under general norms[J]. Operations Research Letters,2004, 32: 510-516.
  • 8Bertsimas D, Sim M. Robust discrete optimization and network flows[J]. Math Program, 2003, Ser B 98: 49-71.
  • 9Ghaoui L E, Oustry F, Lebret H. Robust solutions to uncertain semidefinite programs [J]. Society for Industrial and Applied Mathematics, 1998, 9 (1) : 33-52.
  • 10Gokcen H, Erel E. Binary integer formulation for mixed-model assembly line balancing problem[J]. Computers & Industrial Engineering,1998, 34(2) 451-461.

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部