期刊文献+

软岩交叉巷道开挖围岩稳定性数值模拟分析 被引量:13

Numerical simulation analysis of wall rock stability at intersection of tunneling in soft rock
下载PDF
导出
摘要 本研究以北洺河铁矿为工程背景,针对采准切割工作中出现的软岩交叉巷道,运用FLAC3D对联巷交叉口进行三维数值模拟分析,研究交叉口围岩的力学、位移和变形破坏演化规律,并将控制点的位移监测值与计算值进行对比分析。研究结果表明:数值模拟方法必须辅以现场监控量测,才能客观正确地反映出地下工程在施工过程中围岩应力、位移及塑性区分布等特征,并为施工设计提供有效的参考依据。 There are many intersections in preparatory workings of soft rock tunnel at Beiminghe Iron Mine, 3D numerical simulation analysis of the intersection between link roadways based on software FLAC3D , in which the mechanics of wall rock & displacement & deformational and destructive law are studied, and compared the results between simulation monitoring & practicality monitoring of control points. The results show that the numerical simulation methods must be supplemented by monitoring measurement on-the-spot, so as to reflect the distribution and other features of rock stress &displacement& plastic zones objectively and correctly in the process of underground engineering, and providing effective ref- erence for construction design.
出处 《中国矿业》 北大核心 2011年第9期84-86,91,共4页 China Mining Magazine
关键词 软岩 交叉巷道 FLAC3D软件 数值模拟 soft rock intersection tunnel FLAC3D software numerical simulation
  • 相关文献

参考文献9

二级参考文献47

共引文献258

同被引文献123

引证文献13

二级引证文献80

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部