瀑布沟水电站筒形阀结构设计

Structure Design for Ring Gate of Pubugou Power Station
下载PDF
导出
摘要 瀑布沟水电站单机容量600 MW机组是东方电机首个自行研发、设计、制造并成功投入运行的大型混流式水轮发电机组。机组上装设的筒形阀直径为d9.35 m,该筒形阀是目前国内已运行电站中直径最大、重量最重的筒形阀。本文着重介绍了筒形阀主要结构设计特点及其在水电站的运行情况。 Pubugou power station with capability of 600 MW is a large Francis hydraulic generator, which is designed and manufactured by Dongfang Electrical Machinery Co., Ltd., and have been put into operation. The unit equipped with a ring gate by diameter 9.35 m that is the biggest and heaviest in all the domestic units. This article introduces the structure and operation condition of the ring gate.
出处 《东方电气评论》 2011年第3期38-42,共5页 Dongfang Electric Review
关键词 瀑布沟水电站 水轮机 筒形阀 结构 Pubugou power station turbine ring gate structure