摘要
郁江老口枢纽是一座以航运、防洪为主,结合发电,兼顾改善南宁市水环境的低水头河床式枢纽。枢纽布置方案选择在充分考虑水文、地质、施工、运行、淹没、造价等因素后,结合各建筑物特点,初步设计阶段推荐了右岸厂房方案,并通过模型试验对该方案进行验证和优化。
Lcated on the river bed of Yujiang River and with low water head, Laokou Complex is a project privileged to navigation and flood prevention, combined with power generation and improving water environment of Nanning City. At preliminary design stage, according to the features of all structures, the layout scheme with powerhouse arranged by right bank was selected after the following issues had been fully considered such as hydrology, geology, construction, operation, inundation, cost etc. Model test had been conducted for verification and optimization of this scheme.
出处
《广西水利水电》
2011年第4期12-15,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
枢纽布置
方案
选择
模型试验
老口枢纽
Layout of complex
scheme
selection
model test
Laokou Complex