摘要
以阳城国际发电有限责任公司6×350MW机组为例,主要介绍了阳城电厂锅炉补给水化学一级除盐系统设备的选型及程控分析,论述了阳城国际发电有限责任公司阳城电厂锅炉补给水化学一级除盐系统设备运行情况及存在问题的处理,重点对锅炉补给水化学一级除盐系统的程控进行了分析探讨。
Taking 6×350 MW unit of Yangcheng International Power Generation Co.,LTD as an example,this paper mainly introduces the lectotype design and program-control analysis of chemical 1-phase desalting system's equipment for boiler feedwater,expounds the operation condition of chemical 1-phase desalting system's equipment for boiler feedwater in Yangcheng International Power Generation Co.,LTD and the treatment of existing problems,and emphatically analyzes the program-control of chemical 1-phase desalting system for boiler feedwater.
出处
《科技情报开发与经济》
2011年第24期199-202,共4页
Sci-Tech Information Development & Economy
关键词
化学一级除盐系统
设备选型设计
程控分析
chemical 1-phase desalting system
lectotype design of equipment
program-control analysis