京沪高速铁路跨沪宁铁路既有线桥梁上部结构设计为(40+72+40)m预应力混凝土连续梁。本文重点介绍在桥梁上部结构施工过程中,为保证既有线运营安全所采用的防护棚架施工。
The upper structure of bridge of Beijing-Shanghai high speed railway across the existing Huning railway line was designed as(40+72+40)m prestressed concrete continuous beam.During the construction process of upper structure of the bridge,protection scaffolding construction was adopted in order to ensure the operation safety of the existing railway line.