390MW燃机基础大体积混凝土施工关键技术

Key construction technique of mass concrete for 390 MW gas turbine foundation
下载PDF
导出
摘要 结合某燃气电站基础大体积混凝土的施工,介绍了钢筋绑扎、模板安装、预埋件埋设、混凝土浇筑阶段的主要技术措施。通过合理选材、降低浇筑温度、加强养护和温度监测等手段,对混凝土内外温差进行控制,避免了有害裂缝的产生。工程实践表明:采取上述施工方法能够确保工程质量,是安全有效的。 Combined with the mass concrete construction of a gas turbine plant foundation, the main construction measures such as assembling reinforcements,installing templates, inbuilding embedded parts and concreting were introduced.The temperature differences between internal and external concrete were controlled and the damaged cracks were avoided by choosing reasonable materials, decreasing the casting temperature, curing concrete and monitoring temperature, et al.Engineering practices show that those construction measures above can assure the engineering quality, which are safe and effective.
出处 《混凝土》 CAS CSCD 北大核心 2011年第9期135-137,共3页 Concrete
关键词 基础 大体积混凝土 裂缝 温度监测 foundation mass concrete crack temperature monitoring
  • 相关文献

参考文献7

二级参考文献12

共引文献129

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部