三塔悬索桥施工过程静风稳定性分析 被引量:2

Aerostatic Stability Analysis of Three-tower Suspension Bridge During Construction
下载PDF
导出
摘要 以在建主跨为1 080 m的三塔双跨悬索桥——泰州长江公路大桥为工程背景,采用三维非线性空气静力稳定性分析方法,分析不同的主梁架设顺序对三塔悬索桥施工阶段空气静力稳定性的影响,确定具有良好抗风稳定性的施工方案。结果表明:三塔悬索桥主梁拼装采用从桥塔处至跨中施工时,可以获得较好的空气静力稳定性。 By taking a three-tower suspension bridge--Taizhou Highway Bridge over Yangtze River with main span of 1 080 m as example, by using 3D structural nonlinear aerostatic analysis, the influence of deck erection sequence on the aerostatic stability during the whole construction process is revealed, and the favorable deck erection sequence is also proposed with respect to the aerostatic stability.The resuhs show that good aerostatic stability can be obtained for threetower suspension bridges as the deck erection starts simultaneously from the pylons to the midpoints of main spans.
作者 郭辉 孙华卿
出处 《市政技术》 2011年第5期50-52,55,共4页 Journal of Municipal Technology
关键词 三塔悬索桥 施工过程 静风稳定性 three-tower suspension bridge construction process aerostatic stability
  • 相关文献

参考文献3

  • 1Osamu Yoshida, Motoi Okuda, Takeo Moriya. Structural Characteristics and Applicability of Four-Span Suspension Bridge[J]. Journal of Bridge Engineering, ASCE, 2004,9 (5) :453-463.
  • 2陈艾荣.泰州长江公路大桥结构抗风性能研究报告(四):三塔悬索桥方案节段模型风洞试验[R].上海:同济大学土木工程防灾国家重点实验室.2006.
  • 3向中富.桥梁施工控制技术[M].北京:人民交通出版社,2008:150-280.

同被引文献23

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部