摘要
以某TYJL-Ⅱ型既有计算机联锁车站站改临时过渡为例,对既有线计算机联锁3种改造方案进行分析比对,提出根据实际情况采用不同的设计方案使工程投资、施工工作量、风险度最小化。
Comparative analysis of three reform schemes of existing computer interlocking lines is presented in the paper,temporary transition of the reform of an existing TYJL-Ⅱ computer interlocking station taken as example.Meanwhile,this paper employs different designs according to the fact,minimizing the project cost,construction workload and all the risks.
出处
《铁道通信信号》
2011年第9期27-28,共2页
Railway Signalling & Communication
关键词
计算机联锁
改造
方案
Computer interlocking
Reform
Scheme