结合武钢条材总厂CSP分厂150 t转炉炼钢的生产实际,介绍了自动炼钢控制系统的模型、副枪设备及数据分析系统,并对生产中可能遇到的问题及其对策进行了阐述。
In connection with the practical steel-making conditions of the CSP line of the 150 t BOF in WISCO the automatic steel-making model,the sub-lance equipment and data analysis system are introduced in this paper.Besides the problems which may be encountered in the future and the solutions are proposed as wel1.
出处
《武钢技术》
CAS
2011年第3期13-18,共6页
Wisco Technology
关键词
自动炼钢
模型
副枪
数据分析
automatic steel-making
model
sub-lance
data analysis