摘要
通过对大型立井提升箕斗结构设计的技术改进,大大地提高了箕斗制造生产效率,减少了箕斗制造过程及现场安装过程的辅助时间。同时减少了箕斗在矿井使用过程中的维护费用,提高了箕斗制造及维护效率,降低了工人劳动强度。
Throuhg technical improvements for large-scale skip structure design,greatly improve production efficiency of skip,decrease auxiliary time for skip manufacture.At same time,decrease maintenance charge in use procedure and field installation,improve imanufacture and maintenance rate of skip,reduce workman labour intensity.
出处
《煤矿机械》
北大核心
2011年第10期188-189,共2页
Coal Mine Machinery