矿井摩擦式提升机更换首绳新工艺及应用 被引量:1

New Head Rope Replacement Technique of Mine Frictional Hoist and Application
下载PDF
导出
摘要 介绍了一种矿井摩擦式提升机首绳更换新工艺,主要是用专用U型卡将新旧绳卡接在一起,开动绞车利用旧绳带动新绳将新绳敷设至井底,依靠在井架上的液压调绳装置和快速锁绳器将旧绳替换成新绳,然后反向开车将新旧绳替换。此方法大幅度减少了大型临时设施的使用和井筒作业的安全风险,缩短了施工时间,为提升绞车更换首绳方面提供了相关参考。 A new head rope replacement technique was introduced for the mine frictional hoist.A special U type fastener would be applied to fasten the used and new ropes together.With the winch in operation,the used rope could drive the new rope down to the mine shaft bottom.With the hydraulic rope adjustment device and the fast rope locker on the mine shaft headframe,the used rope would be replaced by the new rope and then the used and new rope replacement could be conducted with the reversed operation of the hoist.This method could highly reduce the application of large temporary facilities and the safety risks of the operations in the mine shaft and could reduce the construction time.This method could provide the related references to the head rope replacement of the mine hoist.
作者 谢国龙
出处 《煤炭科学技术》 CAS 北大核心 2011年第9期70-72,117,共4页 Coal Science and Technology
关键词 摩擦式提升机 首绳 更换 新工艺 frictional hoist head rope replacement new technique
  • 相关文献

参考文献5

二级参考文献13

  • 1王鹏,肖兴明,黄继战.摩擦提升机防滑保护装置制动力的确定[J].矿山机械,2004,32(12):50-51. 被引量:3
  • 2[2]宋杰.基于PLC的摩擦矿井安全监护系统研究[D].徐州:中国矿业大学,2007.
  • 3[3]Barkand T D.Application of a suspension rope brake to a single rope mine hoisting system[J].Conference Record of the IEEE Industry Applications Society Annum Meeting (Cat.No.92CH146-8),1992(2).
  • 4杨兆建,1994年
  • 5彭兆行,矿山提升机械设计,1989年
  • 6Langebrakd F,第22届国际采矿安全会议论文集,1987年
  • 7谈鸣时,煤矿自动化,1985年,3期,38页
  • 8游柏生,煤矿安全,1983年,9期,11页
  • 9杨兆建,煤炭高等院校青年科学基金研讨会论文集,1995年
  • 10杨增夫.煤矿提升系统技术改造实践与展望[J].煤矿机电,2002,23(3):4-6. 被引量:2

共引文献43

同被引文献4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部