期刊文献+

全空间瞬变电磁法在煤矿防治水中的应用 被引量:82

Application of Full Space Transient Electromagnetic Method to Mine Water Prevention and Control
下载PDF
导出
摘要 针对煤矿生产和建设中的水害源探测问题,基于瞬变电磁法"烟圈效应"理论,采用重叠回线装置对掘进工作面前方和回采工作面顶底板隐伏含(导)水构造进行探测,对测点布置和探测方向的设计进行了研究。结果表明:在掘进工作面两侧拐角位置,同一个探测方向分别按与巷道掘进方向呈30°、45°和60°角进行探测,不仅避免了掘进工作面常规方法超前探测时存在的盲区,而且有利于对异常区的空间定位;对回采工作面顶底板探测时,在同一个测点探测方向按与煤层呈45°角向顶板和向底板探测,使得探测范围内发育的赋水构造与工作装置耦合最佳,提高了信噪比。 According to the water disaster prediction problems in the mine construction and mine production,based on "the smoke circle effect" theory of the transient electromagnetic method,the overlapping return line device was applied to survey the hidden water bearing(flow) structures in the front of the gateway driving face and in the roof and floor of the coal mining face and to study the design of the measuring point layout and the survey direction.The results showed that at the turning corner locations of the two side walls in the gateway driving face,the survey could be conducted on the same survey direction with the gateway driving direction in 30°,45° and 60°.Thus the blind area existed in the conventional gateway driving method could be eliminated during the pilot survey and the space positioning in the abnormal zone would be favorable.During the roof and floor survey of the coal mining face,at the survey direction of the same measuring point,the detection could be conducted on the 45° of seam to the roof and to floor,the water structure developed in the detection scope could be best coupled with the work device and the signal and noise ratio could be improved.
出处 《煤炭科学技术》 CAS 北大核心 2011年第9期110-113,共4页 Coal Science and Technology
基金 国家重点基础研究发展计划(973计划)资助项目(2007CB209400)
关键词 瞬变电磁法 超前探测 掘进工作面 含(导)水构造 transient electromagnetic method pilot detection mine roadway heading face water bearing(flow) structure
  • 相关文献

参考文献6

二级参考文献23

共引文献116

同被引文献537

引证文献82

二级引证文献419

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部