摘要
主要介绍了燃气-蒸汽联合循环电站几种主机配置类型的特点,并以某工程为例对联合循环电站主机选型及配置类型进行了技术经济分析比较,得出合理方案。
This paper mainly introduces the features of several host configuration type of the gas-steam combined cycle power plant, and takes a project as an example to undertake technical economy analysis and comparison of the combined cycle power plant host selection and configuration type, obtains the reasonable scheme.
出处
《江西电力职业技术学院学报》
CAS
2011年第3期25-27,共3页
Journal of Jiangxi Vocational and Technical College of Electricity
关键词
联合循环电站
机组选型
配置方案
combined cycle power plant
gas turbine models selection
configuration scheme