期刊文献+

塔机障碍物避让算法的研究 被引量:2

Avoidance algorithm for obstacles of tower cranes
下载PDF
导出
摘要 作为建筑工程的主要垂直运输工具,塔式起重机的安全、可靠、高效对建筑工程而言是至关重要的,如何预防塔机碰撞事故是塔机安全防范中的一项重要内容。为了防止塔机与障碍物之间发生碰撞,首先对现有的塔机工作区域内障碍物进行了建模分析;然后在障碍物周围设置减速调整区域来防止碰撞;最后根据效率和能量两个角度提出了一种塔机障碍物避让算法。研究结果表明,采用该智能避让算法可以大幅度提高效率和节省能量。 As a main transport tool,the safety credibility and high efficiency of tower crane is very important for the whole construction project.How to prevent the collision of the tower crane is an important matter for safety guarantee.In order to prevent the collision between the obstacle and tower crane,firstly,the model of obstacles within the tower crane working area was established,and the deceleration zone around the obstacles was used to avoid colliding.Finally,the avoidance of obstacles algorithm of the tower crane according to efficiency and energy was proposed.The results indicate that the intelligent collision avoidance algorithm can significantly improve the construction efficiency and save energy.
出处 《机电工程》 CAS 2011年第9期1056-1059,共4页 Journal of Mechanical & Electrical Engineering
基金 浙江省科技支撑和引导计划面上资助项目(2008C21112)
关键词 塔式起重机 障碍物 防碰撞 避让 算法 tower crane obstacle anti-collision avoidance algorithm
  • 相关文献

参考文献10

二级参考文献14

  • 1刘阳,吴敏,曹卫华.EPM7128S在电机检测中的应用[J].微计算机信息,2004,20(5):37-38. 被引量:2
  • 2杨清泉,刘春林.塔机防碰撞及工作区域限制技术[J].建筑机械,2004,24(7):78-80. 被引量:17
  • 3乔国山.由两起塔机倒塌事故浅谈塔机装拆安全技术控制[J].建筑安全,2007,22(7):41-42. 被引量:2
  • 4Auering J W,Troger H.Time optimal control of overhead cranes with hoisting of the load.Automatica,1987;23(4):437-447.
  • 5Corriga G,Giua A.An implicit gain-scheduling controller for cranes.IEEE Transaction on Control systems Technology,1998;6(1):15-20.
  • 6张晓华,薛定宇.系统建模与仿真.北京:清华大学出版社,2005.
  • 7田泽.嵌入式系统开发与实例[M].北京:北京航空航天大学出版社,2005.
  • 8ARM Developer Suite Version 1. 2. Advanced RISC Machines. Ltd, 2000.
  • 9张毅刚,乔立岩.虚拟仪器软件开发环境Lab Windowes/CVI6.0编程指南[M].北京:机械工业出版社,2004.
  • 10I^2C总线原理及应用实例[EB/OL].www.mcufan.com.

共引文献37

同被引文献31

  • 1杨清泉,刘春林.塔机防碰撞及工作区域限制技术[J].建筑机械,2004,24(7):78-80. 被引量:17
  • 2潘仲明,简盈,王跃科.大作用距离超声波传感技术研究[J].传感技术学报,2006,19(1):207-210. 被引量:25
  • 3冯诺.超声手册[M].南京:南京大学出版社,1999.357.
  • 4国家安全生产监督管理总局网站.事故查询系统[DB/OL].(2012-12-28)[2013-04-10].http:// media,chinasafety.gov.cn.
  • 5Vivian W Y Tam,Ivan W H Fung.Tower crane safety in the con-struction industry:A HongKong study [J].Safety Science,2011,49(2):208-215.
  • 6Mohamed Al-Hussein,Muhammad Athar Niaz,Yu Haitao.Integra-ting 3D visualization and simulation for tower crane operations onconstruction sites [J].Automation in Construction,2006,15:554-562.
  • 7Smith C John.Quality is key to safe[J].Crane Today,1998(3):26-28.
  • 8Moon Sungwoo,Bemold Leonhard E.Graphic-based human-ma-chine interface for construction manipulation control[J].Journalof Construction Engineering and Management,2008(7):305-311.
  • 9Yehiel Rosenfeld,Aviad Shapira.Automation of existing towercranes:Economic and technological feasibility[J].Automation inConstruction,2007,7(4):285-298.
  • 10成都新泰建筑机械公司.[EB/OL].(2011-04-26)[2013-11-08].http://www.cranesafety-china.com.

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部